no year, stated, nor engine option so all answers will be weak to useless..... posting country helps too as other countries use different engine.... so....... be the first ever in 8000 post to do that... ill be shocked.
its in the book, its not simple like my jeeps.
its a PITA.
but you can read the words, all of them all the steps
in the FSM or at alldata.com
i log in , and put in year, and camry.
i pick cooling , i pick 1mZ engine.
i then see?///??????? (random pasted) you can too, or get and FSM.
1MZ-FE And 3MZ-FE Engines
- Before servicing the vehicle, refer to the Precautions Section.
- Drain the cooling system.
- Remove or disconnect the following:
- Negative battery cable
- RH front wheel
- RH fender apron seal
- A/C drive belt
- PS drive belt
- Engine stabilizer control rod
- RH engine stay
- Alternator bracket #2
- Crankshaft pulley
- Both timing belt covers
- RH engine mounting bracket
- Timing belt cover 1 and 2
- Timing belt, guide and idler pulley sub-assembly #1
- Camshaft timing pulleys and idler pulley sub-assembly #2
- Timing belt cover #3
- Water pump assembly
To install:
- Install or connect the following:
- Water pump assembly with new gasket. Torque to 71 inch lbs. (8 Nm).
- Timing belt idler #1. Torque to 25 ft. lbs (24 Nm).
- Timing belt cover #3
- Camshaft timing pulleys
- Timing belt idler sub-assembly
- Timing belt, tensioner assembly and guide
- Engine mounting bracket
- Upper and lower timing belts covers
- Crankshaft pulley
- Alternator bracket
- Engine mounting stay
- Engine stabilizing control rod
- PS pump
- A/C drive belt
- Inspect drive belt tension
- Right front wheel
- Negative battery cable
- Refill the cooling system to the correct level.
- Start the engine and check for leaks.
on my car , belt off, pump out, and in, done.
×